LAND ENTITLEMENTS


Real Estate Dictionary: Entitlement--The right to develop land with government approvals for Zoning density, utility installations, occupancy permits, use permits, and streets.

In essence, Land Entitlement is what happens with a project before a shovel of dirt is turned.

Entitlements are the backbone of any development. Entitlements dictate “what, where and how much” can be built on a particular property. The “what, where and how much”—have a lot to do with determining the value of a property. A property that has a large number of uses is typically more valuable than the same property with a very limited use.
Entitlements are a legal agreement with the governing jurisdiction to allow a certain development to occur on the site. Entitlements outline the density, function and setback requirements allowed for the property.

Typically, developments can only be financially viable if they can obtain a certain density or usage. Entitlements are the key to legally securing this right from the governing jurisdiction.

When reviewing a development application, a jurisdiction will consider potential impacts such as traffic and environmental risks as well as community acceptance of the proposed development. They will likely require studies from the owner as well as proposed conceptual designs of the project.

Applying for entitlements is a challenging process. Depending on the size of the project and intended use, entitlements can take from a few months to many years to obtain. This is in large part based on the complexity of the project and public acceptance of it.

Wednesday, January 6, 2010

Rural zoned condominium lot


A family owned some property in the rural area of King County. The property included the main home as well as a secondary home that was built many years ago. They wished to have the ability to sell one of the homes and keep the other.

The normal way would be to subdivide the property via a short plat. Short platting the property probably would have cost them about $110,000 for applications, engineering, site construction, bonding etc. and taken about 3 years to complete. Unfortunately, they didn’t even have enough area (a large enough lot) to subdivide, so that wasn’t an option.

In talking with their engineer, they learned of a creative solution for their problem. Cramer Northwest Inc. advised them to do a Condo Survey. The Condo survey accomplished their objective utilizing a different code. In the end, they got their two lots (just like in a short plat) but at a fraction of the time and expense of one.



Method..............~Cost............Time

Short Plat.................$110,000...........3 years
Condo Survey..........$9,500...............7 months

===============================
Savings................91%..............80%


Disclaimer: The codes in your jurisdiction may not be the same. The key to this example is that the clients had two existing homes on the same lot. Please consult a professional such as Cramer Northwest http://www.cramernw.com/ to discuss your particular case.

Monday, December 7, 2009

Report Cards are in

Last week the Municipal League released a study titled "Rights, Wrongs and Reforms: Selected Issues on Land Use regulations in King County." Issues from multiple perspectives are discussed and worth considering.

http://www.mbaks.com/library/issues/LandUseReportFinal.pdf