Showing posts with label King County. Show all posts
Showing posts with label King County. Show all posts

Thursday, April 28, 2011

DDES Pre-Submittal Service Will Reduce Permit Review Time


King County is taking the next step to reform customer service by improving the process of applying for mid-size permits at the Department of Development and Environmental Services – working up-front with customers who bring in permits too complex for over-the-counter service.

Starting April 25 customers with development permits too complex for over-the-counter service, but not complex enough to qualify for a pre-application meeting, will be entered into a new program called Pre-Submittal Services (PSS).

The PSS process will provide direct customer service to applicants before they submit the application by providing feedback to identify technical issues or red flags, and set expectations for the process ahead. This will allow staff at the Department of Development and Environmental Services (DDES) to immediately initiate or review the application as soon as it is submitted, rather than having to go back to the applicant to request clarity or more information.

“Our Department has been working purposefully and energetically over the last year to make permitting processes at King County less burdensome,” said DDES Director John Starbard. “I’m optimistic about this reform to our services. It should speed up review times, improve communication with our customers, and enable applicants to start their projects sooner.”

Incorrect and incomplete application submittals are a major factor that add to the cost and complexity of the permitting process.

PSS will assist with twelve types of mid-size permit applications:
􀂃New Dwellings
􀂃Additions/Remodels/Accessory Structures*
􀂃Agricultural Buildings
􀂃Signs*
􀂃Tenant Improvements*
􀂃Small Commercial Buildings
􀂃Site Plan Resubmittal
􀂃Residential Revision
􀂃Grading
􀂃Right-Of-Way-Use
􀂃Boundary Line Adjustments
􀂃Separate Lot/Lot Mergers

*Some of these permit types may be covered already in the easy over-the-counter permit process

Beginning April 25, applicants who have a PSS qualifying project will pay $357 up front, which will be credited to the cost of the application once the final paperwork is submitted. The total processing time is expected to drop significantly, and each applicant will work with DDES staff to help ensure their paperwork is right the first time, and they can prevent delays associated with the need to stop processing and contact the applicant for more information or clarity.
PSS will be conducted during business days from 9:00 am to 3:00 pm (with a lunch break between 12:00 to 1:00 pm).

The PSS process builds on a series of reforms at DDES under the guidance of King County Executive Dow Constantine, and DDES Director John Starbard. Reforms include the introduction of a fixed-fee model to provide cost certainty for building permits, permit integration with other county agencies, over-the-counter permits, a revised permit intake process, and enhanced relationships with cities and stakeholders.

For hours and location of DDES, visit www.kingcounty.gov/permits

Tuesday, September 21, 2010

King County to offer same-day building permits


While the type of permits that will qualify is fairly limited, it is definitely a step in the right direction and I applaud Executive Constantine for making it. Let’s see if we can get other permit review times down and bring more predictability to fees charged in reviewing them.




New “over-the-counter” permitting at DDES will enable walk-in, one-day service beginning Oct. 18

Front-line staff and supervisors redesign the process for simple permits to better serve customers and eliminate weeks-long wait time

The weeks-long wait for review of many environmental and building permits in King County will soon be a thing of the past. Beginning Monday, October 18, the county’s Department of Development and Environmental Services (DDES) will provide expedited, one-day or “over the counter” review processes for many permit types.

“It doesn’t make sense for someone who needs a quick oil change to have to wait in line behind someone who needs their engine rebuilt,” said King County Executive Dow Constantine. “This change brings that same logical approach to our permitting services, and will save our customers time, money, and aggravation.”

Under the guidance of the Executive’s reform agenda, a team of front-line employees and supervisors jointly designed the streamlined process by which customers who need a simple permit will be able to walk into DDES without an appointment, submit an application, and obtain their permit on the same day.

“It has been awkward to talk to people about our ‘over-the-counter’ permits when they have to wait weeks and weeks for an appointment just to get to the counter,” said DDES Director John Starbard. “This is part of the reforms we’re making at DDES to make our services easier, more accessible, and more predictably-priced.”

Permits that can be obtained “over-the-counter” beginning on Monday, October 18, will include small residential remodels, tenant improvements to commercial spaces, building additions, decks, seismic retrofits, and many others. Appointments will still be required for complex development proposals.

Customers who prefer to make an appointment in advance will still have that option.

DDES offered walk-in permit services in the past, but in the late 1990’s the department was compelled to move to an appointment system due to a surge in construction and other permitting activity. Starbard says the current lower volume of permit applications and a smaller customer base due to annexations and incorporations makes it possible to return to a walk-in system for many permit types.
Jarrod Lewis, DDES Assistant Supervisor for the Planning and Customer Services Section, said front-line employees leveraged their practical, daily experience in processing these kinds of permits to create a new, more streamlined, efficient and effective system.

“It has been very rewarding to see our staff come together and develop service improvements that enable us to work more efficiently while also truly benefitting our customers,” he said.

Starbard announced the redesigned permitting process at today’s meeting of the Metropolitan King County Council’s Committee of the Whole.

Tuesday, July 6, 2010

What’s happening in your neighborhood?


Which neighborhood are you developing in? The Government Affairs issue tracker developed by the Master Builders Association provides a brief status report on current local and regional issues.

http://www.mba-ks.com/library/issues/GA_Issue_Tracker.pdf

Monday, June 14, 2010

New Legislation Extends Time Period for Final Plat Approval


Finally, a little good news for builders and developers who are trying to plat properties. The legislature has granted a temporary extension to save preliminary plats that could expire during this economic downturn.

The Municipal Research and Service Center of Washington (MRSC) has issued an opinion on the Washington State Legislature’s recent adoption of Substitute Senate Bill 6544. The legislation, signed by the Governor, extends preliminary plats for two years, from five to seven years until 2014.
_____________________________________________________________________________________
Opinion:
In SSB 6544 (Ch. 79, Laws of 2010), the 2010 legislature extended the statutory time period for submitting final plats for city or county approval from five years after preliminary plat approval to seven years after that approval. It also extended the vesting period for approved final plats from five to seven years. This legislation, which is effective June 10, sunsets on December 31, 2014.

It appears that the purpose of this temporary extension is to save preliminary plats that are in jeopardy of lapsing because of the economic downturn. This purpose should help explain which preliminary plats this legislation applies to. The original bill included an intent section that, although deleted in the substitute bill that was adopted, sheds light on legislative intent:

(1) The legislature finds that active land use permits are expiring due to a downturn on the state economy. Considerable cost has been expended by applicants and local jurisdictions to approve projects. Allowing these projects to expire would make it difficult for the state to meet its housing needs in the future and impose considerable staff costs on local governments to perform work that has already been completed.

(2) The legislature further finds that, in the current period of economic challenge, an extension for plat approvals will contribute to the overall employment of the state by employing citizens of Washington as soon as is practicable in the family wage jobs of the land development and home building industries.

The public testimony in favor of the bill, as summarized in the various bill reports, also focused on the current economic climate and its effect on development activity.

To read the full opinion, please go to: http://www.mrsc.org/Subjects/planning/ssb6544.aspx

Thursday, June 10, 2010

Can you spare 70 hours for EPA?


Got an extra 70 hours to donate? Are you willing to disclose sensitive financial information? If so, you’re invited to take part in EPA’s upcoming survey?

The U.S. Environmental Protection Agency (EPA) is asking for your input as it considers five new regulations. One of these regulations would require existing developments to retrofit inadequate storm water management controls and another that would require developers to create long-term controls designed to better manage storm water discharges well past the construction phase.

The EPA plans to distribute the survey to 2,400 builders and developers in July. Some people have objections to questions, which require respondents to detail sensitive financial information. The surveys are burdensome as well, with the longer version expected to take about 70 hours to complete, according to the EPA’s own estimates.

The agency is accepting comments from the development community through June 9. The draft is available at the EPA storm water Web site.

To submit comments to the docket — Docket ID No. EPA-HQ-OW-2009-0817 — click here or go to http://www.regulations.gov/search/Regs/home.html#home

Are you going to take the survey?

Thursday, May 6, 2010

All in a day's work


During the final days of their feasibility period to purchase a property, a client requested that I go the Seller’s office to review some documents.

It seems that the Seller had located some additional material that had not previously been disclosed. I was asked to run down and make a quick review of the materials and report back on my findings.

(Note the 21 banker’s boxes of new material)

Monday, April 19, 2010

Permit & Plat Extension Ordinance


The Economic Stimulus Tracker is a matrix of all the permit and plat extension ordinances and other economic stimulus measures being pursued by the King & Snohomish County Master Builder's Association. The matrix is broke down by jurisdiction and is a good tool to follow how cities and counties are working with builders during this down economy. http://www.mba-ks.com/library/issues/esp_matrix.pdf

Wednesday, March 3, 2010

Citizens' Alliance for Property Rights Meeting

Thursday, March 4th: I'll be speaking at the Citizens Alliance for Property Rights montly meeting. I'll be leading the discussion on innovative land use topics in King County. Come join us at 7:00pm

King County CAPR is dedicated to the protection of private property and the rights of property owners.
The King County Chapter meets at 7:00 PM on the first Thursday of each month at the Issaquah IHOP Restaurant located at 1433 NW Sammamish Rd. Issaquah, WA.

Tuesday, March 2, 2010

Starbard picked to direct DDES

March 2, 2010
Daily Journal of Commerce
SEATTLE — King County Executive Dow Constantine appointed former Newcastle City Manager John Starbard as director of the Department of Development and Environmental Services.
The appointment must be confirmed by the King County Council.
DDES issues building and land use permits for properties in unincorporated King County. Constantine said in a press release that he wants to reduce the processing time for permit applications.
While at Newcastle, Starbard worked on upgrading Coal Creek Parkway and making downtown into a walkable urban village. He helped manage incorporation of Maple Valley, and was its first city manager. Starbard worked as a planner and senior management analyst for Bellevue.
Starbard will manage a budget of nearly $22 million and a staff of about 150.

Wednesday, January 6, 2010

Rural zoned condominium lot


A family owned some property in the rural area of King County. The property included the main home as well as a secondary home that was built many years ago. They wished to have the ability to sell one of the homes and keep the other.

The normal way would be to subdivide the property via a short plat. Short platting the property probably would have cost them about $110,000 for applications, engineering, site construction, bonding etc. and taken about 3 years to complete. Unfortunately, they didn’t even have enough area (a large enough lot) to subdivide, so that wasn’t an option.

In talking with their engineer, they learned of a creative solution for their problem. Cramer Northwest Inc. advised them to do a Condo Survey. The Condo survey accomplished their objective utilizing a different code. In the end, they got their two lots (just like in a short plat) but at a fraction of the time and expense of one.



Method..............~Cost............Time

Short Plat.................$110,000...........3 years
Condo Survey..........$9,500...............7 months

===============================
Savings................91%..............80%


Disclaimer: The codes in your jurisdiction may not be the same. The key to this example is that the clients had two existing homes on the same lot. Please consult a professional such as Cramer Northwest http://www.cramernw.com/ to discuss your particular case.

Monday, December 7, 2009

Report Cards are in

Last week the Municipal League released a study titled "Rights, Wrongs and Reforms: Selected Issues on Land Use regulations in King County." Issues from multiple perspectives are discussed and worth considering.

http://www.mbaks.com/library/issues/LandUseReportFinal.pdf